{"id":11821,"date":"2021-02-01T11:55:24","date_gmt":"2021-02-01T11:55:24","guid":{"rendered":"https:\/\/eodishasamachar.com\/en\/?p=11821"},"modified":"2021-02-01T11:55:24","modified_gmt":"2021-02-01T11:55:24","slug":"agel-commissions-100-mw-solar-power-plantsin-uttar-pradeshahead-of-schedule","status":"publish","type":"post","link":"https:\/\/eodishasamachar.com\/en\/2021\/02\/01\/agel-commissions-100-mw-solar-power-plantsin-uttar-pradeshahead-of-schedule\/","title":{"rendered":"AGEL commissions 100 MW Solar Power Plantsin Uttar Pradesh,ahead of schedule"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>Ahmedabad,\u00a0February 1<sup>st<\/sup>, 2021( Odisha Samachar )- <\/strong>: ASE4PL, a subsidiary of Adani Green Energy Limited (\u2018AGEL\u2019), commissioned 100 MW (2&#215;50 MW) Solar Power Plants atJalalabad in Shahjahanpur district andSahaswanin Budaun district ofUttar Pradesh. Our team of experts made it possible to commission the plantsalmost 1 monthahead to their scheduled commissioning date.Both the plants have Power Purchase Agreements (\u2018PPAs\u2019) with Uttar Pradesh Power Corporation Limited (\u2018UPPCL\u2019) at Rs. 3.22\/kWh and 3.19\/kWh, for a period of 25 years.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">AGEL\u2019s Energy Network Operation Centre (\u2018ENOC\u2019) platform which has continuously demonstrated and aided us in achieving superior operational performance ofourentire solar and wind plants spread across diverse locations in India, willalso embracethese two commissioned solar power plants for delivering consistent performance.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">With this,we have added a capacity of 700 MW capacity since the beginning of challenging COVID-19 pandemic crisis.This places AGEL\u2019s total renewable portfolio of 14,815 MWwell on track to reach its vision of 25 GW capacity by 2025.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Speaking on this development,<strong>Mr. Vneet S. Jaain, MD &amp; CEO, Adani Green Energy Ltd <\/strong>said, \u201c The Company\u2019s approach of 3 years of advanced site resource estimation, design planning, supply chain assurance with our team\u2019s commitment and ability to deliver projects with great focus, makes it possible for us to execute the projects ahead of committed schedule.Italso asserts our expertise in executing and operating the plants. With this, we continue to strengthen our advancement towards our long-term vision to achieve renewable capacity of 25 GW by 2025 through a mix of strategic approach and operational excellence.\u201d<\/p>\n<p style=\"text-align: justify;\"><strong>\u00a0<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ahmedabad,\u00a0February 1st, 2021( Odisha Samachar )- : ASE4PL, a subsidiary of Adani Green Energy Limited (\u2018AGEL\u2019), commissioned 100 MW (2&#215;50 MW) Solar Power Plants atJalalabad in Shahjahanpur district andSahaswanin Budaun district ofUttar Pradesh. Our team of experts made it possible to commission the plantsalmost 1 monthahead to their scheduled commissioning date.Both the plants have Power &hellip;<\/p>\n","protected":false},"author":1,"featured_media":11822,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[42],"tags":[],"_links":{"self":[{"href":"https:\/\/eodishasamachar.com\/en\/wp-json\/wp\/v2\/posts\/11821"}],"collection":[{"href":"https:\/\/eodishasamachar.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eodishasamachar.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eodishasamachar.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/eodishasamachar.com\/en\/wp-json\/wp\/v2\/comments?post=11821"}],"version-history":[{"count":1,"href":"https:\/\/eodishasamachar.com\/en\/wp-json\/wp\/v2\/posts\/11821\/revisions"}],"predecessor-version":[{"id":11823,"href":"https:\/\/eodishasamachar.com\/en\/wp-json\/wp\/v2\/posts\/11821\/revisions\/11823"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eodishasamachar.com\/en\/wp-json\/wp\/v2\/media\/11822"}],"wp:attachment":[{"href":"https:\/\/eodishasamachar.com\/en\/wp-json\/wp\/v2\/media?parent=11821"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eodishasamachar.com\/en\/wp-json\/wp\/v2\/categories?post=11821"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eodishasamachar.com\/en\/wp-json\/wp\/v2\/tags?post=11821"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}